Within the framework of this task the installation of a heat pump (570 kW) was executed to operate with the exchanger from vertical ground probes (93 vertical drillings of a combined length of 9300 mb), as well as solar installations of a surface area of 120 m2.
Furthermore, a cogeneration system was executed with a heat power of 115 kW and an electric power capacity of 70 kW, which shall serve the production of heat and power in the gas turbine powered by ground gas.