INERGIS S.A. Group of Technical Schools in Mielec

Group of Technical Schools in Mielec

Within the framework of this task the installation of a heat pump (570 kW) was executed to operate with the exchanger from vertical ground probes (93 vertical drillings of a combined length of 9300 mb), as well as solar installations of a surface area of 120 m2.

Furthermore, a cogeneration system was executed with a heat power of 115 kW and an electric power capacity of 70 kW, which shall serve the production of heat and power in the gas turbine powered by ground gas.

 

 

 

Planujesz podobną inwestycję? Porozmawiajmy.

Zaprojektujemy i wykonamy komplet: HVAC, automatyka, OZE — od koncepcji po serwis.

← Zobacz inne realizacje