Department of Borkum in the North Sea
(Implementation: 2014)
The project made a modernization of central heating systems, ventilation and air conditioning. These works were carried out on an active object.
As part of the commissioned task was made following modernization works;
– Installation of 18 roof ventilation units with a capacity of 7000 m³
– Installation of ventilation sheet metal ducts from DN 80 to 600 mm, coated aluminum and stainless steel cladding
– Central heating system with a complete heating centers and associated fittings with a total power output of 1200 kW,
– Installation of refrigeration and cooling control panel with fittings with a total capacity of 500 kW.
As a result of modernization works carried out contributed to a better exchange and indoor air quality Clinics and decisively reduced operating costs. All tasks were performed on the active object and do not cause interference to the Clinic.