Ruhr University Bochum
(Realization: 2014)
We made heating and cooling systems. The works were carried out on the new facility.
– The central heating with panel with a total capacity of 5,000 kW,
– Installation of refrigeration and central cooling system with a total power of 2500 kW.
Applied new heating and cooling system since the beginning of the operation is very effective throughout the facility, and the use of modern devices causes low operating costs.